Job 09-35 - In progress.

(46 images)

The original structure was built 100 years ago. Through the decades the house has had four additions, each one unique. On the second story, each of the four additions has a different floor plane. There are four different floor levels. This creates a design and structure challenge for the project for which we have been hired. The different floor levels will be left as they are, but we will attempt to align the many roof planes.

 The existing garage will be demolished and a new Great Room and Garage will be added where the old garage stands.

Many of the exterior photos were shot from about the same location to allow the viewer to monitor day-to-day progress.